The work of Rad dd Tešanj presented at the location of the renovated chlorine cells in Jelah results of successfully implemented development projects with a total value of 330,000 KM (excluding VAT), which are a significant step forward in the digitization of key business processes.
During the past 12 months, the development of development projects worked on the necessary funds, of which 120,000 KM were provided through the FBiH Environmental Protection Fund, while the remaining funds were provided through regular operations and municipalities of Tešanj as the founder.
Presented projects include:
Water supply telemetry – 232.026,30 KM
Sewage network telemetry under construction – 42.050,00 KM
Lora WAN remote control and monitoring system – 41.729,90 KM
Reconstruction and external arrangement of the chlorine station / supervisory center – 14,151,40 KM
These systems provide modernized water supply system management from one central location, real-time surveillance, faster detection, key process automation, water and flow level monitoring, as well as significant savings in fuel, maintenance and labor force. At the same time, the system provides opportunities for remote control of pumps and monitoring night consumption.
After the realization of the project, even 63% of the objects of JP operation Tešanj is now covered by telemetric supervisionwhich represents an important step towards modern and sustainable communal governance.




